The training of lifting of diving team using a DC station is complete.

dk-station-small

A full team successfully completed a training in underwater installation of guideline to the decompression station. Education, held in Sevastopol from 14 to 17 May, included skills training of the team to consolidate the lead late in the immediate vicinity of the object, the rise of the diving team with a use of lead and performing decompression stops. The final stage of lifting is the divers movement into the decompression station and lifting of threaded end by the supply team to the board of the ship. Then the divers continue to drift in the DC – station under the control of the brig , and visual inspection from the ship. After desaturation of nitrogen in the body of divers is over, divers climb aboard and then pick up a decompression station.